King Rama VIII Cantilevered Cable Bridge (Bangkok, Thailand)

King Rama VIII Bridge is a cantilevered cable bridge across Chaophaya River. Total span is 300 metre and 100 metre. It finished in 2003.

Southeast Asia Technology Co., Ltd. (SEATEC) was assigned to design review, design checking, modification and professional endorsement of temporary and false works for main bridge and approaches include:
– Sheet Pilings
– Plat Forms
– Piers
– Docks
– Bridges
– Pilings
– Scaffoldings
– Temporary Offices.

Leave a Reply