A consortium of 2 SEATEC Group companies Southeast Asia Technology Co. Ltd. (SEATEC) as a lead firm and Dynamic Engineering Consultants Co., Ltd. (DEC) were awarded the Construction of Krabi Air Catering Project on area of 3 rai at Krabi International Airport, Petch Kasem Road, Amphor Nua Klong.
Provide consulting services for THAI in (1) Study the catering management and services for the 1,250 set daily production at present and future expansion; (2) Master Plan for land use with conform to Airport Master Plan; (3) Design the new Catering and Facilities including develop an area 300 sq.m. at passenger terminal; (4) Assist in permission for construction, coordinate with AOT authorities; (5) Details for BOQ, Tender documents and etc.; (24 Mar.- 22 May 2008) (6) Assist in bidding process; (7) Consultancy Services for Management and Construction Supervision (8 Apr.- 3 Dec.2010)